pre contract final cost plan
pre contract final cost plan capture
final cost plan
we calculate detailed building costs and prepare tender documents
pre contract final cost plan capture
To ensure that the auction/tender package already include all necessary requirement, on this phase QS will coordinate with other consultants and do the following:

  1. Receive detail engineering design (DED) drawings from each planning consultant and proceed to prepare bill of quantity (BQ) and budget plan/rencana anggaran biaya (RAB) based on these documents.

  2. Prepare the auction/tender documents for main contractor and nominated sub-contractor (NSC).

  3. Suggest some cost-saving method/value engineering (VE).